logologo
HelpLoading...
Saturday 16 September 2023, 14:00, 15:00Passed
September 2023
Saturday 16
14:00 - 15:00
15:00 - 16:00

STEP de Gallardon

Rue du Bourg-Neuf, 28320 Gallardon
  • Eure-et-Loir
  • Centre-Val de Loire

Visit of the treatment plant

European Heritage Days 2023
Saturday 16 September 2023, 14:00, 15:00Passed
@ Veolia

Visit the Gallardon Wastewater Treatment Plant and learn about wastewater treatment!

Types d'événement
Visite commentée / Conférence
Thèmes 2023
No selection
I agree that the image may be freely used, provided that it is attributed to the author by name and shared under the same conditions.
Conditions de participation
Gratuit, Sur inscription
Type de public
Tout public

About the location

STEP de Gallardon
Rue du Bourg-Neuf, 28320 Gallardon
  • Eure-et-Loir
  • Centre-Val de Loire
This project was completed in December 2013 and the new station was inaugurated on Saturday 12 April 2014\. Built in the 1970s and managed by the SIA (Syndicat Intercommunal d'Assainissement) of Gallardon/ Bailleau-Armenonville, the sewage treatment plant was no longer up to current standards and its capacity had become insufficient. This is why in 2008 the SIA decided on its total reconstruction, for a capacity of 5,800 equivalent inhabitants. In 2010, Ternois was chosen to carry out this project.
Tags
Édifice industriel, scientifique et technique