Discover how a wastewater treatment plant works
The sewage treatment plant will open its doors on Sunday 18 September from 9am to 12:30pm and from 2pm to 5:30pm for guided tours.
Sunday 18 September 2022, 09:00Passed
Conditions
Free. Reservation required. 15 people maximum per group. Provide closed shoes for your safety. Some works will not be accessible to children. The tour is not accessible with a stroller.
©m.fontaine/limoges metropole
On the program...
- Overview of Water Cycle Management
- Presentation of purification processes and structures
- Flocculation/Decantation Test
- Cleaning Truck and Network Camera Inspection Demonstration
Practice: - A departure every 1/2 hours (duration of the visit: 1 hour).
- Visitors are asked to arrive 15 minutes before the visit (possibility to park on the site).