German underground built in Hallines in 1943 (guided tour lasting about 40 min)
guided tour of an underground built by the organization TODT to arrange design offices for the German Engineering (special constructions ( V1, V2, V3)
17 and 18 September 2022Passed
Conditions
2€ adult, free for accompanied children, take a warm jacket, temperature 11 to 12°C
Stéphane MILAMON
Guided tour by group of 10 to 15 people (no booking, several guides will be available) duration of the tour about 40 min. entered 2€ adults, free for children acompanied, take a warm jacket, temperature 11 to 12 °C
Briefly the book could be described as follows:
Two large parallel galleries 30 metres apart, connected by 6 galleries 4 metres wide and having a height of 2.90m under the vault, only 3 bays were drilled and stoned.
These galleries were each divided into 8 offices and served by a corridor one meter wide.
For more details come visit us!