logologo
HelpLoading...
Domingo 18 septiembre 2022, 09:00Passed
Setembre 2022
Diumenge 18
09:00 - 18:00

Station d'épuration de Limoges Métropole

106 rue de Nexon, 87000 Limoges
  • Haute-Vienne
  • Nouvelle-Aquitaine

Discover how a wastewater treatment plant works

The sewage treatment plant will open its doors on Sunday 18 September from 9am to 12:30pm and from 2pm to 5:30pm for guided tours.
Domingo 18 septiembre 2022, 09:00Passed
©m.fontaine/limoges metropole

On the program...

  • Overview of Water Cycle Management
  • Presentation of purification processes and structures
  • Flocculation/Decantation Test
  • Cleaning Truck and Network Camera Inspection Demonstration
    Practice:
  • A departure every 1/2 hours (duration of the visit: 1 hour).
  • Visitors are asked to arrive 15 minutes before the visit (possibility to park on the site).
Types d'événement
Visite commentée / Conférence
Thème 2022
Patrimoine durable
I agree that the image may be freely used, provided that it is attributed to the author by name and shared under the same conditions.
Conditions de participation
Gratuit i Sur inscription

About the location

Station d'épuration de Limoges Métropole
106 rue de Nexon, 87000 Limoges
  • Haute-Vienne
  • Nouvelle-Aquitaine
Built in the late 1960s and expanded in 2000, the main wastewater treatment plant in Limoges Métropole has continued to evolve, adapting to population growth and environmental issues.
Since 2020, it has been undergoing major upgrades. Its operation has been completely redesigned with the installation of new technologies that will allow its energy optimization and achieve significant savings.
Tags
Édifice industriel, scientifique et technique
Acceso
Public transport nearby and parking on site.