Visit of the Vaumort signalling station on the Paris-Lyon High Speed Line

Presentation of the railway infrastructure of a High Speed Line, then visit of one of the 30 "relay" signalling stations, that of Vaumort, dating from the origin of the line (1979).
Sábado 17 septiembre 2022, 10:30, 14:00, 16:00Passed
Herramientas de registro
 0386867099 0977067458
Philippe BALSON (SNCF Réseau)

From the bridge of the D20 over the LGV, presentation of the components and systems of the high-speed railway infrastructure and the systems contributing to its operation. Then, visit the Vaumort signalling station, relay technology (PTS), and the various features present in the building built in 1979. Comments and visualization on site, of the present operating arrangements (banalization, emergency dock, operation of the post in "local control"...). Information on important work in progress (LGV+), which will see the replacement of these positions, which will have had 3 million high-speed trains, in November 2024, by electronic card stations (SEI). A little information on European signage (ERTMS) will be discussed. A brochure will be given to each participant.

Types d'événement
Visite commentée / Conférence
Thème 2022
Patrimoine durable
I agree that the image may be freely used, provided that it is attributed to the author by name and shared under the same conditions.
Conditions de participation
Gratuit

About the location

Pont de la D20 sur la LGV, entre Cerisiers et Dixmont Yonne
Cerisiers
  • Yonne
  • Bourgogne-Franche-Comté
30 signalling stations are distributed along the LGV Paris Lyon. They were built in 1979 for the operation of the LGV in 1981\. These stations (PRS), of "relay" technology (including Vaumort N°14), are remote controlled from PARIS, by the PAR (Switchboard and Control Station), located at the Henri LANG Centre. This technology will be replaced in November 2024 with Electronic Card Systems (SEI) stations. The visit will allow to discover from the bridge of the D20, the technological environment of a high-speed infrastructure, then to visit the station 14 of Vaumort, which, during its disconnection in 2024, will have enabled no less than 3 million high-speed trains to circulate safely.
Tags
Patrimoine ferroviaire, des transports et du génie civil
Acceso
Parking along the D20, on the left (heading towards Cerisiers). near the bridge over the LGV
Philippe BALSON (SNCF Réseau)