logologo
HelpLoading...
Sunday 16 September 2018, 09:00Passed
Conditions
Free admission from 9 h till 15 h. On reservation of total outlays from September 10th.
September 2018
Sunday 16
09:00 - 19:00
Accessible to the hearing impaired
Accessible to the visually impaired
Accessible to the psychic impaired
Accessible to the motor impaired
0 to 99 years old

Groupe PSA site de Trémery

Site de Trémery, 57300 Hagondange
  • Moselle
  • Grand Est

Pole(Centre) Trémery Metz: bare of one of the biggest factories of engines of world

Come alive again on the 50 last years thanks to the cars which made history. Discover stages of manufacturing of an engine and affect(touch) the future of the finger seen by the Group PSA.
Sunday 16 September 2018, 09:00Passed
Conditions
Free admission from 9 h till 15 h. On reservation of total outlays from September 10th.
@Groupe PSA

Small and big(great) will be able to begin by reliving cars on the 50 last years in fault Peugeot, Citroën and DS; engines and gearboxes which made history. Then, a play and interactive route(course) will make you discover stages of manufacturing of an engine and the numerous jobs(businesses) which make up(compose) a factory by wandering in our workshop(studio) on the meeting of the staff. Finally, you will be able to affect(touch) the future of the finger by discovering how Pole(Centre) Trémery Metz and PSA group conceive(design), from today, the future of automobile and of industry: electrical collaborative vehicle, robots, robots motive(mobile), service(department) of mobility, …


Places(Squares) are limited and the outlays of free entrance(entry) will be to remove from the entrance(admission) of our sites of Metz (91 Boulevard Solidarity in Metz) and from Trémery (industrial zone Ay on Moselle – Trémery) from September 10th.
The visitors will have the choice(selection) between 4 slices(edges) schedule to reach event:
9h-11h; 11h-13h; 13h-15h; 15h-16h30. At the end of festivities at 19 h

Types d'événement
No selection
Édition 2018
No selection
Conditions de participation
No selection
Tags
No selection

About the location

Groupe PSA site de Trémery
Site de Trémery, 57300 Hagondange
  • Moselle
  • Grand Est
The site of Trémery entered active in 1979 and 44,8 million engines were since produced there. It is the 3rd factory of engines in world
Tags
Édifice industriel, scientifique et technique
Access
Since Paris: highway A4, taken(brought) out Argancy (N°37), to take D1 direction Ennery (Z.I. of Garolor). Follow signposting "Entered visitors". • Since Metz: highway A31 direction(management) Thionville / Luxembourg, taken(brought) out autouroute A4 direction Strasbourg, taken(brought) out Argancy, take D1 direction Ennery (Z.I. of Garolor). Follow signposting "Entered visitors". • Co-ordinated GPS(GLOBAL POSITIONING SYSTEM,GLOBAL POSITIONING SYSTEMS): 49 ° 14' 33" N and 6 ° 12' 40" E.
Groupe PSA